What this job is
Retail pads along 90A, US-59, I-10, and NASA Parkway used the same island detail: oak, curb, 6 inches of asphalt. The curb is now a ramp. Barrier plus a mill of the failed bay is cheaper than losing the tree and restiping a dead island.
Apartment and HOA common walks are the other commercial ticket. We can sequence buildings so residents keep a path.
We carry insurance, we restore, and we photograph the finished island for the property file. The work is the trench and the panel.
Problems that actually show up
- Parking-island oaks heaving asphalt
- ADA walks out of tolerance
- Shopping-center islands after 15 years
- HOA common-area paths
- Apartment community sidewalks
- Office-campus parking at Town Center
Sequence
- Site walk with PM Islands, ADA, irrigation, night work if needed.
- Phased trench Keep a pedestrian route. Cone the bay.
- Commercial panel Thicker HDPE, locked joints, depth for parking loads on the other side of the curb.
- Restore and photo For the property file.