Houston clay We set depth on your lot. Catalog inches are a guess.
811 before we cut If a marked line is in the way, we move the trench.
Real reviews only We will not invent star ratings.
Site walk We mark the tree, the structure, irrigation heads, and the cleanout. If a plumber already camera’d the lateral, we watch the video. Written scope: depth, length, restoration, what we will not touch.
Texas 811 Public locates. Private irrigation is on you to map if you have it. A marked line in the trench means we move the line of the wall — we do not “be careful.”
Trench Vertical cut on the structure side. Houston Black stands when it is not soup. After two inches of Gulf rain we wait or we shore. Galveston sand is a different method entirely.
Panel Virgin HDPE seated to the floor. Joints lapped or locked. Bamboo gets a lip. Sidewalk jobs sit below mower height so the HOA does not fail the parkway.
Backfill Clay in lifts. A void behind the face is a root highway next August.
Restore Sod match, city parkway rules, photos for the ACC or the property manager.
Read materials if you want the sheet spec, or workmanship for what we will put on a quote.
Houston clay · Gulf irrigation · a wall in the soil
Keep the tree. Stop the heave.
Root Barrier Houston installs HDPE root barrier along sidewalks, slabs, sewer lines, bamboo, and commercial parking islands across Greater Houston. Grinding a walk is a season. A barrier stops the next lift.